Project Overview
Warrawoona Gold
(Pilbara, WA)
The Warrawoona syncline is one of the largest greenstone-hosted goldfields in the East Pilbara.
Commissioning of the processing circuit commenced in April 2022, with the mine officially producing gold in early May 2022.
TVC was engaged to supply a range of valves for the project, such as manual ball, butterfly, diaphragm, check, float valves & knife gate valves; actuated butterfly and ball valves.
Western Australia
Mining
Gold

